Bathroom & kitchen waterproofing in Riyadh
Bathroom leaks usually appear in the ceiling below, after the tiles are laid. Correct waterproofing before tiling saves expensive demolition later.
- Free site inspection
- Warranty up to 15 years
- Photo-documented work

What you should know about bathroom & kitchen waterproofing
Bathrooms and kitchens are wet every day: water on the floor, splashes on walls, and drains and pipes penetrating the slab. Any untreated point, especially around the drain or at the floor-wall junction, becomes a path for water.
We apply the waterproofing as a continuous layer over the floor and up the walls, seal drains and pipe outlets with reinforcement pieces, then flood-test before the tiler starts.
Where it fits
New villas and apartments
Waterproofing before tiling at the lowest cost.
Bathroom renovation
A proper fix after removing old tiles.
Kitchens and laundry areas
Protect floors exposed to spills.
Bathrooms above occupied rooms
Top priority to protect the ceiling below.
How we install it, step by step
- 1
Floor preparation
Cleaning, crack repair and falls towards the drain.
- 2
Drains & pipes
Reinforcement pieces and flexible tape around every penetration.
- 3
Corners
Mesh tape at floor-wall junctions and wall corners.
- 4
Two coats
Across the floor and at least 30 cm up the walls, higher in showers.
- 5
Flood test
24 hours of ponding while checking the ceiling below.
- 6
Handover to the tiler
With guidance to protect the layer during tiling.
Technical specifications
Typical values from approved manufacturers' data sheets, final systems and thicknesses are confirmed after the site survey.
What determines the price?
We price after inspection because these factors vary by site, our quotation lists each item explicitly.
- Number and size of bathrooms.
- New build or renovation with tile removal.
- Upstand height on walls.
- Selected system.
Request a written quotation
We inspect your site and send a quotation stating the system, thickness, preparation and warranty line by line.
Request a quote on WhatsAppFrequently asked questions
Can a bathroom be waterproofed without removing tiles?
Transparent sealers can treat grout joints in minor cases, but leaks from under the tiles or from the drain need tile removal.
How high should waterproofing go on walls?
At least 30 cm around the floor, and 180 cm or more in the shower area.
How long does it take?
Typically one day to apply and one day for the flood test.
You may also need

Waterproofing
Liquid, membrane, cementitious and polyurea systems for roofs, walls, foundations and wet areas.
Read more
Pool waterproofing
Flexible cementitious or polyurea systems for new and existing concrete pools, with a fill test.
Read more
Cementitious waterproofing
Flexible two-component systems that bond with concrete, for tanks, pools and wet areas.
Read moreBook a free inspection for bathroom & kitchen waterproofing
Call us, message us on WhatsApp or fill in the form, our team will schedule an inspection and send a written quotation.